HV Test leads setup for 220kV Cables
LV test on 220kV Cables
66kV GIS Test at an Underground S/S
132kV GIS Test
220kV GIS HV Test
132kV Cable Termination works
Omicron PD Kits
Cable Fault Locations
Cable Laying Activities
Asphalt demolish works prior to Trench excavation
Asphalt laying works by Manually
Backfilling-works
Cable laying in Out door
Cable laying works (Snaking)
Cable laying works Drum set up
CBS pouring activity (purpose To maintain the Resistivity cooling-purpose)
Centermedian fixing works
Cleaning works prior to CBS burried
Compaction by Roller machine
Concrete pouring for Roadcrossing works
Demolish works in RC
Drum set up for Cable laying works
Dune sand filling for Interlock worksk
Dune sand filling in Joint bay
During cable laying activity
During compaction works
Fluidized Thermal Backfilling (FTB) pouring works
FTB bed poured prior to Cable laying
FTB pouring in RC
HDPE fixing in Road crossing works
Joint bay construction works
Manual excavation in critical area(Caved)
Manual excavation over live Utilities
Manual trench excavation
Precast Joint bay
Protection tiles laid over the CBS
Protection tiles laying over HV cable
PVC warning tape laying after complete the Two layer of Backfilling soil
Road crossing FTB pouring
Road crossing works HDPE pipe laying
Route Exacavtion in Hard rock
Route surveying As built works
Trench excavation prior to FTB bed
Trench route Excavation
Trial pit inspection
Water proofing works in all over concrete surface
Waterproofing works in All over outer concrete surface